-
Furnace hot spot repair in the live tail gas Incinerator saves $156M
In this audio case study, learn how IGS's Hot Refractory Repair prevented a potential $156 million shutdown cost for a Central Asian oil and gas producer. It also highlighted the crucial role of proactive maintenance in sustaining uninterrupted energy production.
-
How a petrochemical plant avoided $12m in losses
A petrochemical plant battled over 10 hotspots on a roof-fired reformer, exposed flames, and the threat of a $12 million loss, see how they avoided a full shutdown.
-
How fireside ceramic coating enchance thermal spray performance
Discover how Fireside ceramic coatings improve boiler protection by enhancing thermal spray performance, reducing porosity, sealing microcracks, and boosting wear resistance in high-temperature environments.
-
Mitigating Erosion: HVTS cladding solution for QAPCO quench column
In this case study, we discuss how IGS's High-Velocity Thermal Spray (HVTS) Cladding technology solved erosion issues in QAPCO's Quench Column VE140001.
-
Performance Improvements with IGS Cetek Coatings
Explore the 18-year impact of IGS Cetek dual emissivity coatings on coker heater tubes at a leading German refinery. Learn how these coatings optimize efficiency, extend run lengths, and enhance reliability, with insights on their application and ongoing benefits.
-
Tube Tech increases thermal efficiency by 3% at Tupras Izmir refinery
In today's episode, explore the solution provided by Tube Tech (an IGS solution) that not only increased thermal efficiency by 3% at the Tupras Izmir Refinery in Turkey but also significantly enhanced heat transfer efficiency.
PODCASTS
SPONSORS