logo


Question

  • What measures or techniques do you employ to optimise the cooling of coke bed in drum and mitigate the occurrence of hot-spots? If you are performing pressurised quenching, what specific pressure levels do you maintain within the drum during the initial water quench ramp?

    Jun-2023

Answers




  • Responsive image Solve the Industrial Data Problem
  • Responsive image Smart solutions for valves and valve automation
  • Responsive image FCC catalyst solutions
  • Responsive image Top Performer in Portable Fuel Analysis
  • Responsive image FCC Refining Catalysts
  • Responsive image Ejector Systems
  • Responsive image Better analyses. Better decisions.
  • Responsive image 6 - 8 May 2025,
    Dubai, UAE
  • Responsive image Chemical Treatments
  • Responsive image Level and density in FCC processes