logo


07-10-2015

MRPL agreement with NMPT for setting up an LNG Terminal

MRPL & New Mangalore Port Trust signed an MoU today to study the feasibility of setting up an LNG Re-gassification Terminal, at Mangalore.

The MOU, signed by  Shri H Kumar, MD MRPL & Shri P.C Parida, Chairman, NMPT, this evening at NMPT Conference Hall, facilitates MRPL, to initiate Feasibility &other associated studies, to identify the most suitable location for the facility, and to consider the option ofsetting up LNG Terminal/ Floating Storage Regasification Unit (FSRU)

The LNG Terminal once set up will bring “gas”, cleaner, greener energy,  as a fuel option to the entire region, and will be advantageous to industries  currenty using naphtha as fuel

hri Vishnu Agrawal, Director (Finance) MRPL, Shri M Venkatesh, Director (Refinery) MRPL, Shri Suresh P. Shirwadkar, Dy.Chairman, NMPT & other senior Officials from MRPL & NMPT, were also present on the occasion.

Sponsor:

News Category:

Other News Items

  • Responsive image Smart solutions for valves and valve automation
  • Responsive image Solve the Industrial Data Problem
  • Responsive image Top Performer in Portable Fuel Analysis
  • Responsive image Chemical Treatments
  • Responsive image 6 - 8 May 2025,
    Dubai, UAE
  • Responsive image FCC catalyst solutions
  • Responsive image Ejector Systems
  • Responsive image Better analyses. Better decisions.
  • Responsive image FCC Refining Catalysts
  • Responsive image Level and density in FCC processes