logo


23-06-2014

Foster Wheeler EPCm services agreement for replacement heat exchangers with BOC

Foster Wheeler AG announced today that a subsidiary of its Global Engineering and Construction Group has signed an engineering, procurement and construction management (EPCm) services agreement with BOC, a member of The Linde Group, for the installation of replacement heat exchangers at BOC’s Teesport facility, Teesside, in northeast England.

The Foster Wheeler contract value was not disclosed and was included in the company’s first-quarter 2014 bookings.

Under this agreement, Foster Wheeler will provide project management, front-end engineering design, detailed engineering design, procurement services, construction supervision and quality assurance for the replacement of existing aluminium plate fin exchangers in the 1,300 tons per day air separation plant. Installation is scheduled for completion in the fourth quarter of 2014. The Teesport facility provides oxygen and other gases to industrial facilities in the region.

For more information, please visit www.fwc.com

Sponsor:

News Category:

Other News Items

  • Responsive image Better analyses. Better decisions.
  • Responsive image Level and density in FCC processes
  • Responsive image 6 - 8 May 2025,
    Dubai, UAE
  • Responsive image Solve the Industrial Data Problem
  • Responsive image Top Performer in Portable Fuel Analysis
  • Responsive image Smart solutions for valves and valve automation
  • Responsive image FCC Refining Catalysts
  • Responsive image FCC catalyst solutions
  • Responsive image Chemical Treatments
  • Responsive image Ejector Systems