logo


26-03-2014

Planned maintenance of para xylene units at Jamnagar complex

Reliance Industries Ltd has taken a planned maintenance shutdown of one of its three Para Xylene units at Jamnagar. The scheduled shut down period is approximately for a period of six weeks.

This shut down will also be utilized to improve reliability and performance of the unit. The other two Para Xylene units will continue to operate normally. Reliance Industries Ltd has a total capacity of 1.8 million MT per annum of Para Xylene at Jamnagar.

Sponsor:

News Category:

Other News Items

  • Responsive image Smart solutions for valves and valve automation
  • Responsive image Top Performer in Portable Fuel Analysis
  • Responsive image Ejector Systems
  • Responsive image FCC catalyst solutions
  • Responsive image 6 - 8 May 2025,
    Dubai, UAE
  • Responsive image Better analyses. Better decisions.
  • Responsive image FCC Refining Catalysts
  • Responsive image Solve the Industrial Data Problem
  • Responsive image Level and density in FCC processes
  • Responsive image Chemical Treatments