logo


21-11-2013

Testing of Hydrogen production installation has been started at TANECO

Commissioning tests have been started at the hydrogen production installation of the combined hydrocracking complex of the "TANECO" Refining and Petrochemical Plants Complex in Nizhnekamsk.

Hydrogen production is an integral part of the whole hydrocracking process. Currently the installation has been put in the mode of comprehensive testing. Purity of the final product has amounted 99.99 percent.

The project documentation of the facility has been developed by JSC "Giprogazoochistka" and JSC "VNIPIneft". The contractors for construction are ZAO "Servistehnomontazh", OOO "NefteGasEngineering", OOO "Tatspetsneftehimmontazh" Management Company, OOO "NP "Tsentromontazhavtomatika", JSC "Salavatneftehimremstroy", JSC "Trust No.21 Building Company", OOO "Spetsenergomontazh", OOO "Neftehimzavodstroy" and JSC "Kamgesenergostroy".

The manufacturers and suppliers of the equipment are both Russian and foreign ones: Bugulma Mechanical Plant of JSC TATNEFT, OOO Volgovyatsky mechanical plant, OOO "NPO "Ufaneftegazmash", ZAO NPF "EnergoTransServis - TSA", JSC "Uralkhimmash", ILSUNG CORPORATION (South Korea), Heurtey Petrochem (France), Borsig GmbH (Germany) and UOP (USA).

Sponsor:

News Category:

Other News Items

  • Responsive image FCC catalyst solutions
  • Responsive image Ejector Systems
  • Responsive image FCC Refining Catalysts
  • Responsive image 6 - 8 May 2025,
    Dubai, UAE
  • Responsive image Solve the Industrial Data Problem
  • Responsive image Smart solutions for valves and valve automation
  • Responsive image Level and density in FCC processes
  • Responsive image Better analyses. Better decisions.
  • Responsive image Chemical Treatments
  • Responsive image Top Performer in Portable Fuel Analysis