Maximize reliability in grassroots crude units
Crude unit operators are far too familiar with a long list of crude unit reliability problems including fouling in heat exchangers and fired heaters, poor desalting, corrosion of piping and equipment, and coking in the vacuum column wash zone. Many millions of dollars have been spent fighting these problems, yet they continue to force unplanned shutdowns with depressing regularity. Revamps must address reliability issues, but project scope is hindered by the limitations of existing equipment. Grassroots design of crude and vacuum units presents an opportunity to get everything right the first time. Here are a few tips for designing a reliable and profitable crude/vacuum unit.
HEAT EXCHANGER AND HEATER FOULING
High velocities in heat exchanger tubes produce high shear at the walls, preventing foulants from accumulating. High shell-side velocities, coupled with exchanger designs that minimize dead zones in the flow, eliminate shell-side fouling. In fired heaters, high mass fluxes maximize wall shear, shorten residence time, and lower wall film temperatures, all of which reduce coking. Furthermore, reliable heaters must have correctly sized burners with proper burner-to-burner and burner-to-tube spacing.
DESALTING
Desalter size is highly dependent on crude blend due to dramatic variation in required centerline velocity. A unit must be designed with the flexibility to carefully control desalter temperature, which can range from 110°C to 150°C, by shifting heat from upstream to downstream of the desalters. Vendors are often judged on cost alone, which results in minimum sizing for the design crudes and rates. Carefully consider whether long-term crude trends will soon render these desalters inadequate.
CORROSION
In grassroots design, be realistic about metallurgy. Because modern refineries do not run a steady diet of the same crude, consider the sulfur and TAN numbers of potential crudes outside the unit’s design blend. Chronic corrosion issues, or the inability to process high-margin opportunity crudes, will quickly overshadow the initial savings from choosing too low of a metallurgy.
VACUUM COLUMN WASH ZONE COKING
Wash zones are not for fractionation, they are for de-entrainment! Pursuing fractionation efficiency by specifying a deep bed with small crimp packing is a recipe for rapid coking. The correct choice of packing combined with the right wash rate and good distribution will properly
-
Oil sands crude — profits and problems?
Canadian bitumen production currently runs about 1 MMbpd, with some being sold as Synbit and Dilbit. Over the next 10-12 years output is expected to increase to 3.5 MMbpd and more refiners will begin investing to process it and come to depend on the Synbit and Dilbit for a significant part of their supply. ...
-
Heavy crudes are here to stay. As longs as oil prices remain high, Canadian, Venezuelan, Deep Water Gulf of Mexico, Mexican and other low API gravity crude oils will play an ever more important role in supplying world refineries. And prices promise to remain high because gainsayers notwithstanding, Hubbert ...
-
Designing deepcut vacuum units that really work
Every barrel of vacuum gas oil (VGO) you can save from being reduced to coke in the delayed coker unit is a barrel more that can go to the FCCU. That’s a good reason to raise HVGO cutpoint. But how to do it? Some people think the job can be done just by running computer models in the engineering ...
-
A time for grass roots thinking ?
Within the past year or two spiking crude prices and surging refinery margins have led to overheated talk about increasing refinery capacity worldwide. Plans for construction of as many 60 grass roots refineries have been discussed. But stretched out lead times for major equipment and inflated prices, ...
-
A single integrated vacuum system
Failure to design the vacuum unit as an integrated system will invariably result in unsatisfactory yield and poor product quality (high vanadium, nickel, microcarbon, or asphaltenes), and ultimately, an unscheduled shutdown. To avoid these revamp problems the charge pump, fired heater, transfer line, ...
-
Back in the late 1970’s and early 1980’s when fuel gas prices were high, energy utilization assumed major importance. A new method of calculating heat exchanger networks was developed. It was called Pinch Technology. Today pinch has been rediscovered by engineers who have access to fast computer ...
-
A group of interesting articles* deals with opportunity crudes, a mixed breed that includes very heavy, sour and high total acid number types as well as those with unexceptional naphthenic acid content but which do have significant concentrations of aliphatic acids or possess the ability to generate ...
-
Processing heavy Canadian crude
Reducing crude oil cost is the major incentive driving crude and vacuum unit projects to handle heavy Canadian crudes. But such crudes–Albian Heavy, Christina Lake, MacKay River and others derived from oil sands–today present refiners with a unique set of problems not just because of extra-low ...
-
Why do many crude/vacuum units perform poorly?
In many cases it’s because the original design was based more on virtual than actual reality. There is no question: computer simulations have a key role to play but it’s equally true that process design needs to be based on what works in the field and not on the ideals of the process simulator. ...
-
Why produce diesel from the vacuum unit?
Look ahead five years. The economy is likely to keep tightening and the rush to control pollution will inevitably be accompanied by demands for greater energy conservation. Consequence? A growing market for diesel which yields more energy per unit volume. Yet many continue to believe that producing diesel ...